40
levels under the impression that the permanent works would be commenced almost immediately
The roadwa
ay beer barrelled and poised to the
however has since
height of
the
red).
line and in
site of the wall behoun Cross section ho 30 and White's Landing steps. This length of the wall is recommended to be placed little further out for
A
purpose of oblaining
A
better allign.
the
a better.
joint
with the
рем
munt and...
many plans concreted, pending the finals settlement
of
the
style
of structure to be adopteds.
in
The offsets in black figures denoter the depth of water along the foot
of
the wall.
wall during dow Water Springs
S. W. Monsoon
༦༽
02 A.
Showing he d. is a repetitions larger scale and with mois details
of
the
portion linted ped in Draw_
ing he 1 and is intended
especially
to show by
jula us
of
the red line the proposed altered.
site
manent
at While's steps.
From Cross Section he 30 eastwards
to the end of the Reconstructions opposites Wardley Street, it is
-mended to build ther
the same line and
hous
of
it is recom
ZALLA
wall in
A
the forenda.
the old wall which are good
and solids
tails
dre
which point fuller de
given further on. Drawings hos. It to 24 are
Cross Sec.
on)
tions loker at points denoted both plan and longitudinal Sec. and show the position of the
existing
tow