38 Q

I

the contemplated works of repair. and peconstruction will only petard the latter to

indefinite time.

Turning our attention therefore, solez to the portions tiuled agellow and

Red ( Brawing ho 1) it will be per ceived that of the two, the latter.

ľ

fortunately

by far the shorlin length, while in regards to the yellow, there are at short and re- peated intervals along its entire extent, places prom fut long where not

50

6130

the

coping courses has been shaken

or displaced, in spiter of the road

behind it having been in

bony

many places scoured out by

sex in 1874.

Drawing ho. 2.

contains too longi

tudinal

longitudinal sections. The lower

one extends from the westerns mencement of the

the wall to a

lo pc.

point on the Praya Central where it is pro- posed to bring to a

upper

termination the

work of reconstruction, while the Section includes the whole the Praga Cast. There is a gap cnrepresented by any longitudinal Exction, corresponding to the

- imbanked portion of the shore abreast

the place just mentioned. where the military

of

and havol: An-

thorities are established, and whose objections to the embankment mush form the subject of a separate and

special reporte

The longitudinal sections show the ground live at the foot of the wall

Ex

Share This Page