38 Q
I
the contemplated works of repair. and peconstruction will only petard the latter to
indefinite time.
Turning our attention therefore, solez to the portions tiuled agellow and
Red ( Brawing ho 1) it will be per ceived that of the two, the latter.
ľ
fortunately
by far the shorlin length, while in regards to the yellow, there are at short and re- peated intervals along its entire extent, places prom fut long where not
50
6130
the
coping courses has been shaken
or displaced, in spiter of the road
behind it having been in
bony
many places scoured out by
sex in 1874.
Drawing ho. 2.
contains too longi
tudinal
longitudinal sections. The lower
one extends from the westerns mencement of the
the wall to a
lo pc.
point on the Praya Central where it is pro- posed to bring to a
upper
termination the
work of reconstruction, while the Section includes the whole the Praga Cast. There is a gap cnrepresented by any longitudinal Exction, corresponding to the
- imbanked portion of the shore abreast
the place just mentioned. where the military
of
and havol: An-
thorities are established, and whose objections to the embankment mush form the subject of a separate and
special reporte
The longitudinal sections show the ground live at the foot of the wall
Ex