35
Sleight of the Teyphoon wave ___
Action of Portions
the
bo de
of
the old wall left sta
anding-
Pago
234
36
36
Foundations in Prayas Cast and West 36
Description of Masonry
New walls built in 1873.
The traffic
on
the Praya
37
42-
Pragas Best and Cast after the Typhoon 115 Praga houses and the typhoon
118
a new wall 57
Considerations in designing Reconstruction section A
Reconstruction Section B
دک
works of Repair, Concrètes roadway
Davits
Landing steps Rohlar piers Timber jettie's
Drain outfalls
Rocke
Sitting up of
up of Victoria Harbour. Unfortunates attitude of Military
And Naval Authorities
Tidal currents.
687
The Tides
Reasons of
altered site for
Section A 76
tow
borks.
of
Repair
80
877
92
93
34.
за
за
102-
104
109
110
///
Reasons why the Praya connot be
sea level in §. W. Monsoon.
Provisionals and temporary works -
Building Materials Granite
116
117
122.
paised.
83
Do
Trüber
123
Works
of
Do
Repair; paising wall-
Pointing 12acking
Ses
ther
-Shingle
125*
87
Do
s.
Fitting
in
125
88'
Concrete
12.6
1