Drawing Nr. 4.

Ward which forms the basement of Wing A.

Present Female associated

Drawing

W. 5. Ground plan of the Gaol premises as proposed to be re-arranged.

Buildings coloured blue in Drawing Nr. 1 are cleared away.

Offices for Superintendent by the new block and new quarters and Staff.

Drawing Nr. 1 and out. substituted in red for adaptation to Separate Séption. The

adaptation of first and second floors to the Separate System.

W. 6. Plan showing proposed

399

Abstract of Estimated cost of Adapting Victoria Gaol to the Separate System with 502 Cells.

Conversion of Wing A into 171 Separate cells $11,949.44 Building a New Wing B. with 72. $14,332.41 Conversion of Wing Building & New Wing Extension and Conversion of Wing B into 87 $3,949.57 do. $10,080.08 Construction of a new detached Block with 130. $7,489.20 Demolition of buildings $4,4819 and re-erection of quarters and offices for Gaol Staff $34,857 Improved water supply and drainage $15,103 Total $95,780.077 $42 0.0 1000- oo.

"(The Copy)

Castis

Colonial Secretary