Originals
2010
Wallach.
B.
Memoranda as the Engineers took required
88
for the doth water circulating system. Left and Larmday fillings.
1.
1 1⁄2 Bault. Provide and fix in stokehold under
: Enth end of corida a with in welded, double Corrical bailu 2′ 8′′ diameter and 30" high with
C. 1. firmau bars 18" long, glory a fire 16 wide: 2.1.hearing hors dead plate clamy dom and dad
C. 1. furnace front with fri and ark pisdom, C. I nuk pieu and cause to feeding hole and set
of Hoting Cauld
2. Hohwath cistern.
Provide and fix in stokehold under
of sums
< flon becondale, birth black, ajakirind wistion his watu cistern 3' x 3' and 2'6" deep with close top, manhole and cover and 1/4" thick
an pipe carried up through roof: cold iron bunun Harry cistern.
2. Fick
Zinc cistern. Provide and fix Insufficiently
( for
÷
薯