Much of the exigencies of tropical climate. The foul drains are in all cases carried as crisply as possible through the briefs of all formation and changes of the line, being things directed as formed.

Since the diameter of the pipe and at all important formation manholes are forced to be high, in addition to providing for inspection and flushing, may also, by the introduction of grated openings with covers, be made to effectually ventilate the pipes.

To add a further safeguard against the entrance of sewer gases into the building, ventilating shafts are carried up in the form of a flue in the angle of the Manhole at the Sakeine some of...

Considerable endeavour has been made to make the structural portion of the buildings, partly in order to prevent a partially finished construction (or rather a less completed cobwork title) Chauctio, and partly to avoid the risk of damage from white ants. Fear and correctness have therefore been largely in the design, in conformity with the practice obtaining in recent construction in this country, with the triple inception that care has been taken before immersion.

Care has been considered advisable internally in positions where misconstructions might arise from deterioration.

Page 47

Share This Page