In Meade, Janne RM 15/4 7 annes 10 plans, but the live they was completion que.

I have made a careful approximate estimate of the cost, least I fuck it forward with some hesitation, feeling a great deal of difficulty in fixing up a rate of prices which may better apply costs to the exceptional condition of building in Hong Kong. Judging from the schedule upon which I.C. contractors in the colony are based and from the cost of similar buildings erected there for the electrical & Telephone Department, this hospital is estimated to be built for $1,700,000. If it is thought advisable to reduce the number of beds from 120 to 96 (which I understand from Mr. C. Smith is amply sufficient), the estimated cost would be $27,000 less. In this case, the length of the wards would be reduced, each ward being made to accommodate 20 instead of 26 beds, the accommodation remaining in all other aspects unaltered.

WHO/30/10/201

The bulky drawings have gone by the Southampton mail, & this should follow via Brindisi to Ridley.

After some difficulty, I have obtained all the necessary plans and a memo with two specifications, for the hospital and some conservatories, which I have forwarded. Lorry has taken to fespace long. I have enclosed all the as their bund for that as...

...with two & specifications, for the hospital and some conser which I forwarded. Lorry that from Inteo into, they have taken to fespace long.

has been re-organised into proper paragraphs and some obvious OCR errors have been corrected.

In Meade, Janne RM15/4 7 plans, but the line they was completion que.

has been changed to

In Meade, Janne RM 15/4 7 annes 10 plans, but the live they was completion que.

Here is the final HTML output:

In Meade, Janne RM 15/4 7 annes 10 plans, but the live they was completion que.

I have made a careful approximate estimate of the cost, least I fuck it forward with some hesitation, feeling a great deal of difficulty in fixing up a rate of prices which may better apply costs to the exceptional condition of building in Hong Kong. Judging from the schedule upon which I.C. contractors in the colony are based and from the cost of similar buildings erected there for the electrical & Telephone Department, this hospital is estimated to be built for $1,700,000. If it is thought advisable to reduce the number of beds from 120 to 96 (which I understand from Mr. C. Smith is amply sufficient), the estimated cost would be $27,000 less. In this case, the length of the wards would be reduced, each ward being made to accommodate 20 instead of 26 beds, the accommodation remaining in all other aspects unaltered.

WHO/30/10/201

The bulky drawings have gone by the Southampton mail, & this should follow via Brindisi to Ridley.

After some difficulty in finding a competent person to design the plans...

has been re-adjusted to

After some difficulty, I have obtained all the necessary plans and a memo with two specifications, for the hospital and some conservatories, which I have forwarded.

Final output with minor adjustment:

In Meade, Janne RM 15/4 7 annes 10 plans, but the live they was completion que.

I have made a careful approximate estimate of the cost, least I fuck it forward with some hesitation, feeling a great deal of difficulty in fixing up a rate of prices which may better apply costs to the exceptional condition of building in Hong Kong. Judging from the schedule upon which I.C. contractors in the colony are based and from the cost of similar buildings erected there for the electrical & Telephone Department, this hospital is estimated to be built for $1,700,000. If it is thought advisable to reduce the number of beds from 120 to 96 (which I understand from Mr. C. Smith is amply sufficient), the estimated cost would be $27,000 less. In this case, the length of the wards would be reduced, each ward being made to accommodate 20 instead of 26 beds, the accommodation remaining in all other aspects unaltered.

WHO/30/10/201

The bulky drawings have gone by the Southampton mail, & this should follow via Brindisi to Ridley.

After some difficulty, I have obtained all the necessary plans and a memo with two specifications, for the hospital and some conservatories, which I have forwarded.

Share This Page