1

PLAN OF

COPING

71055

APPENDIX B.

EXISTING

ELEVATION

SCALE

WATER

SECTION.

buttie of the wall face has always been 1 in 6 which

I think will be founds too great, a pound Coping

liable to upheaval by the breaking of the sea has usually

been added for appearance', as also

dwarf parapet

wall which is forced out by the backwash.

: The backing of the well has usually been puddled,

clay and in many

layers.

places simply Earth punned in

The foundations of the wall along the entire frontage

گربه پوسم

a puler rocky, and:

of the City are good, being inspections of the structure after severe storms have

always shown that the work of destruction always began from the top masmry downwards.

The work of repairs besides the Concrete backing- will include the personals of the parapet and of the circular molding also under-pinning and pointing in Portland Cement where necessary.

Alice.

Surveyor General.

15. May 1875.

PRAYA

H. WATER

WALL

to be added does not exist, but is proposed NOTE. The concreting shown here

LAY.

Share This Page