I and of the different

feet in width and, depths shown in the

Cross Sec-

tion. The stones will be squared

in all their sides and joints and

will be laid in Portland Cement.

e another

mortar, and fastened to one, by wrought iron clamps of the dimens

-sions shown in the Drawing, and

run

with lead. The upper course

which is most liable to

of onavonry which enjury from the shocks of the

the wav

and the bumping of wrecks will be formed of Stones, dovetailed into,

another, and clamped as shown in

The

the plan. The

ones

- foundations will be

protected by large granite boulders

laid along the footings of the wall.

St

It

posed to have either

is not proposed

coping

or

542

- parapet in the new design .

A vertical backing of Portland Cement Concrete three feel thick -

will support the Masonry prom top

ек

to bottom, and

layer of the

the same

two.

。 feet

thick will be spread over

the Prays Roadway

to a width of

ten

8 feet, thus forming/.

impermeable

ard

shell which will save the structure

from being undermined in its pear.

Italice

Surveyor General

15. May. 1875.