515
last when
my
and
surveys
final
estimates were completed but
the fact that
m.
the
eve
of
for
submitting their certain westure-
were
aoning
-made to me by Mefor: Wiloar and Salway practising Engineers and Architects of this City on behalf of certain of their clients -land and houses along the sea frontage, who expressed themselves desirous of rebuilding at their response those portions of the sea
wall and autant ment
opposite
non
their respective properties subject to the following conditions : -
(1). That the sea wall should
- nit (seawards)
the built further
Po
as to reclaim from
large
aw
the Garber
area as practicable
to be converted into land for
building pampoo
towers
(ii).
.00 ea.
That the mannie Lat
jiming
in the work of
redarnation should receive leases from the Ornon for the areas rendered available by the profmed
redamnatio between their respective
bundaries.
(iii).
That the Crown Rents should
not be levied upon these new
extensions until the
d was
ground
actually built upon and that the rental should be less than that brikerts charged for Manne Lot