18
*
19
592
ard to In all
paving and raising yard respects and as far as possible in accordance with the drawings
and instructions herein contained
also to the further working drawing and instructions that be issued from time to ~
may
time as
the work proceeds.
The Contractor is to attend
- carefully to such instructions, working drawings and diagrams. The Contractor is to provide
and maintain a proper boarding with
secure
gate round the
said works du
during
their
progress. He is also to provide
and cause to be cleaned daily proper Latrines for the
Avse
of his
: The whole to be finished and
- given up in clean and proper order within Eight (8) months from date
of Contract or order to proceed with the work under a penalty of 75. per
day for every day
$5
the work remains
unfinished after the above stipulated
period.
(Signed) R. A. Boyce
Gt Surveyor Arch!
workmen.