part clean broken bricks, tiles, stone,
· and gravel to one (1) of fresh stone lime all to be thoroughly mixed and incorporated before using, all surfaces to be levelled for Brick work.
walls
wert arches
walls
Build of best blue Singfung bricks the Basementierstructure base of superstructure walls :concrete foundations, to the heights
upon the
and thickness shewn on
plans and
sections .
to Baseme
Face the Basement wall on the Peking Stonefacing road side with soochow granite ashber to the height of verandah level. The
wcharging
archt's
ne places I flues
remaining
three
remaining
have stone 17.
in
high
over
sides to
vurface to
pavement
All walls to have stone damp courses at least 3" thick and full width of the
Base wall.
Turn invert arches (five half Bricks thick) between all piers- verandahs,
the inverts to be full
windows, ye ye
thickness of the walls they
the walls they abut against.
The Superstructure walls, from Basement to roof to be carried up of the soundest Singfung bricks in lime and fresh water sand morter. Discharging arches to be turned over - all opens at least 15 in thick lintels - when used to stop short of the springing
the arches.
of
Leave provision in walls for
- fire places and flues therefrom, where
shewn, and
direct
a
carry up
cts
the flues in possible to the outside
line as the smoke stack - taking
of
Damp com
the inside surface smooth
care to draw
Ro
the
work