3 584

part clean broken bricks, tiles, stone,

· and gravel to one (1) of fresh stone lime all to be thoroughly mixed and incorporated before using, all surfaces to be levelled for Brick work.

walls

wert arches

walls

Build of best blue Singfung bricks the Basementierstructure base of superstructure walls :concrete foundations, to the heights

upon the

and thickness shewn on

plans and

sections .

to Baseme

Face the Basement wall on the Peking Stonefacing road side with soochow granite ashber to the height of verandah level. The

wcharging

archt's

ne places I flues

remaining

three

remaining

have stone 17.

in

high

over

sides to

vurface to

pavement

All walls to have stone damp courses at least 3" thick and full width of the

Base wall.

Turn invert arches (five half Bricks thick) between all piers- verandahs,

the inverts to be full

windows, ye ye

thickness of the walls they

the walls they abut against.

The Superstructure walls, from Basement to roof to be carried up of the soundest Singfung bricks in lime and fresh water sand morter. Discharging arches to be turned over - all opens at least 15 in thick lintels - when used to stop short of the springing

the arches.

of

Leave provision in walls for

- fire places and flues therefrom, where

shewn, and

direct

a

carry up

cts

the flues in possible to the outside

line as the smoke stack - taking

of

Damp com

the inside surface smooth

care to draw

Ro

the

work