Westem Slaughter Wenuse & 900.
This estimate provides for the cost of removing the Eartaw to the Westen Slaughter Worse, a worth rendered necessary by the impossibility of draining the forner effecturally, and
recommended an
h
ecmonical
grounds by the increaved rental)
of $125 per month offered by the Contractor for me
building
large
in lien of two with Staff of Sewants at each.
Thus
d and recommended
required
the work is being proceeded
with.
Jervois Street $3000.
The repairs to this
Street are
assigned
233
unch wanted
very and cannot for the remors in the accompramping Petition and Report be delayed either with to the claims of the
justice
highly
Shoptreepers who are
or with regard
respectable,
to public interests which
require
that
Main
thoroughfare should have proper drainage and Raverage. Being
thus
urgently required the repain