1 4

amount

it's first cost, by the of Land that it will give

access to and which will this

become available for building

sites.

I have, te, Signed) L4.

"Litt. Morsme, Surveyor General

ний rather & apre

650

Abstract from Icitimate of Cost of Read found

from

the Public Gardens to Wong-new Ching Gap.

1

Cutting

_br.670

2. Walling

6031.2

Cub. Yard

4

3. Bridge over Military Mullah

22.719. the Cubift

4.270 g. fl. of dressing. 455 — Chamfering linest

4 Wanchar Nullah Bridge

406242

கி

@ R

@ 2

340796

342

24748

کھ

6031 30

910 374905

609 38

Yards

@b

19584

hum

2492

é Catchwäter Drains. 3,26 hil 6. Parapets 3'x27418 ft-

1648 Cube Wands 345 of 6 feet

2. Calverts

Go

210

240

+

@814gs $08895-

990

5

1009.50 1895

+

1080

4

3

@ 4 so

893895

Conting mais.

gencies.

lead to op

8 46,54932 463493

$1,204 25

(Signed) L. At Monson,

Jumayor General

17 June 1878

Lizume

Share This Page