1 4
amount
it's first cost, by the of Land that it will give
access to and which will this
become available for building
sites.
I have, te, Signed) L4.
"Litt. Morsme, Surveyor General
ний rather & apre
650
Abstract from Icitimate of Cost of Read found
from
the Public Gardens to Wong-new Ching Gap.
1
Cutting
_br.670
2. Walling
6031.2
Cub. Yard
4
3. Bridge over Military Mullah
22.719. the Cubift
4.270 g. fl. of dressing. 455 — Chamfering linest
4 Wanchar Nullah Bridge
406242
கி
@ R
@ 2
340796
342
24748
کھ
6031 30
910 374905
609 38
Yards
@b
19584
hum
2492
é Catchwäter Drains. 3,26 hil 6. Parapets 3'x27418 ft-
1648 Cube Wands 345 of 6 feet
2. Calverts
Go
210
240
+
@814gs $08895-
990
5
1009.50 1895
+
1080
4
3
@ 4 so
893895
Conting mais.
gencies.
lead to op
8 46,54932 463493
$1,204 25
(Signed) L. At Monson,
Jumayor General
17 June 1878
Lizume