in the drawing accompanying the Requisition & that if Mandlay's Machinery had

been sent out it would have also occupied the same space; their Boiler would have extended to within 3 or 4

inches

of

the same height

above the deck - cut off the

same number

For

ber

of

deck beams

the boiler, (and an additional

one for the engine hatch) and

therefore any

objection made by lengthening the vessel is

quite irrespective of

any

peculiarity of arrangement or proportion of the Vessels & Boiler

as compared with those by Messrs Mandlay.

In conclusion I am

at a

loss to understand what could be done for the better had the same Requisition to be again

acted upon - Three London Machinery Experts

were supplied

with a copy of the Requisition & Drawing of the vessel - they all sent their own plans from these particulars only – all their Boilers protruded about the same height above the

deck.