ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR
additions to Central Schools.
PLAN OR DESCRIPTION.
yoore was
It has been long felt that another and commodend class
indispensable at these schools 444. Cube yards of digging
and wheeling away the head master writes - "I propose to devote more 2700. sq ft of split gramite in foundations time to the First class than I have hitherto been ables 18300 cubeft. Brickwork
do and it is therefore very.
chat class in
gutters
a flat roof square tiles on,
desirable that I should he 3000. og ft. doubletting secured with wire
class
amy
by themselves - I shall then als without creating class whose progress I
260
of double tile ge
YO
/200
1552
Z.
yo
new
be able to take into this confusion in the others,
may from time to time choose to test - this part of my work. I have hitherto been unable to perform, on account of
the
size of my
again he have o place where all the boys
ber
desirable to d
eve
70
Je
asverrebled when it is nec
00
classes
essary
Cras
car
the accompanying tracing shews the proposed means of providing for the increased.
accommodation and the is prepared in detail.
estimate
^
Chunam floor
of dressing, squaring breluzing old paving of 7 Stone Candings
605
Zabor in removing present stips taking up parnry
men 144 days
** *.*.
20
Betting & lange Iron Trap
cach
Building + new Chimney from Laboratory
$ Corbels under trusves
یکی و شیر
6.8 2.0.
Redressing 21 Stone steps &fexing
Extra labor to teles round, Ventilators
gable
stores co
sotringers
بیتیم
106 56
در راس هیتر
1632
300
7
3469
209 60
360
-
345
م من
کھو کہ کبیر
62 22
20
واهیم کر
14
تی کم
6
67
3.3
Forward.
3/22 6/
Approved,
Ruta Braves Mandrell
Governor.
EX