AAG
545
جی
I
Sitract from Contract for the construction of Sex Wall at Kowloon.
"The Wall to be constructed
in strict accordance with the
Crawing prepared in the Surveyor General' Office.
"Rough boulder Stone to be thrown in all along the line
of required wall and brought= to a leach surface 2 feet below Low Water springs width on surface to be & feet, and interstice. filled up with shawls as for possible
"Above the boulder foundation