538

first requested to analyze had bson procured, and also that the specimen which he afterwards Mlained by the Governor's desire from the building, and which gave nearly 17 per cent of time.

گی خوبی

the

result of his professional

analysis, interior of

walls

Chemid's

2:00/0

and

careful from the

was taken

taken from

of

the brick

in the central part of

the Building

4.

Under these circun

these circumstances

this Excellency is inclined to

put faith in the previous analysis,

which at least

4 least proves

that whatever trivial errors

as

to percontage may

by the

کریمی

roy

have been made.

analysts, there has been discreditable laxity of

supervision by yourself and

your

مجھ

subordinates

މ

ther maller

above.

of considerable importance It is, however, pemarked, almost unnecessary

to refer to that analysis, because

letter of the 9th July

you'r

only

you

maintain that Gnostar

لا اسم اسم السلام

containing for lime throughout the building.

6.

A

made

for

50

used

the contract was

Jer

ant

of lime

and the price payable to the

Contractor

ADA S

cover

that

Share This Page