(Art. of

OFFICE OF SURVEYOR GENERAL

ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FO

and Sea Wall West of Peddar's Wharf.

PLAN OR DESCRIPTION.

pe-

Immediately after the Typhoon of 1st October last itings reportin that much damage had been done to the Prayas Wail, West of Peddar's Wharf and that it was

little better than as prect as •far as Mess. Gebh. Wharf a distance of 2200 feet and between the Harbor Master's Office und Centre Street a distance of 2500 feet. The Cost of taking down, and building the Old Wall on these sections, making use of such of the old Stone as

might

ht be suitable was

estimated at $94.000 while the Cool estimuus of building

a new dea Wall capable of resisting a Typhoon, at $ 135,000. This estimate horrever did not include a lingth of 1050 feet between M Lots 37A and 200 a part of the Harbor opposite which it was last year proposed to reclaim at the expense of the Tenants, scheme which has since been given up. The total cost for would therefore be $ 187,500. between Seddai's Wharf and Centre Strat exclusive of a section between the Harbor Master's Office and M Lot 37 v. Contract for which has just been arranged; at a Cost of # 68.700, the greater portion of which sum has to be paid by the Tenants.

a. New Nall

At the present time it is proposed only to peet the Sea Wall in the same state of repair in which it was before the severe Typhoons of last year.

These repairs

are shown in detail in the accompanying Estimate 755 feet him: of Sea Wall has to be entirely rebuilt and will be constructed in the same mannev as the Sea Wall latily completed between Wardley Street and the Government Wharf, the remainder,

Approved,

(Signed) R.G. Mackommell

Governor.

Resitting Landing Stips opposite M Lots bb & 99 Est

side only. Labor and Material Resetting Steps Sopraik's Wharf, both sides - Labor

and Material

Resetting Steps M Lots 10 and 10.8 both sides

Labor and Material

40 ft link New Sea Wail, M Lots 10 and 10 B

up old Stone Resetting Landing of single flight steps opposite

Mt Lot 12 and pointing. Labor and Material.. Resulting 300 ft lint Parapet Cast of. Gottinger St. 25° Rebuilding Stips opposite in Lot 13. Labor & Material

40 ft lin: Sex Mail opfwsite M Lot 13. Slight repairs to paving Settings St Khaef

Laber and Material

100

526

200

200

easing

of 20

200

100

75

400

lex 20

800

Subuilding Steps opposite M Lot 146 both sides

Labor and Material

NC Lot 114.

Resetting 50 ft lin : Parapet Resetting 110 ft. lin. Parapet M. Lot 15

- Reselling single flight of Steps East of CentralMartiet

Laber and Material.

Fornard

e

50

400

C

25

c 25

12/30

10

100

3.247 50