the New Sea Wall this

increase

or

enience will much

It is proposed to carry in length from

Piles 100 feet

spar

on

out

a.

Breakwater

the Sea Wall, a Floating

the last side will assist

breaking the sea

and a small Harbor will thus be formed between the Jetty and the New Sea Wall ma

comparatively

naking

the Landing heavy weather.

by easy even during removed and

the

the

077

& Jetty.

Some

arrange-

out

The existing

Ost boats brought up

regard also become nece

cessary

ments with

to the alteration of the Dr

in

carrying

Drainage the proposed

works, at present a 3 foot drain empties itself close to the Harbor Master's Office,

West side

of

and a

the

6 foot drain the Pacific Mail Steam Ship

Mail Steam Ship Compry" pre-

mises. Both these drains it is proposed to divert to the extreme West of the proposed New Sea Wall, the water the Praya takes a head here

here is

deep and

as

itiona suitable place for the deposit of

The Total cost.

cost of

the

everage

the proposed works is estimated at $26.000.- $11800. of which has been voted by the Council for expenditure during.

dearing the

The current

6 year

1868 Supplementary

No. 38.)

REPORT AND ESTIMÅTE No. 2 3 OF 1868.

Wall Bonham DATED 10°

10th March 1868.

PARTICULARS.

LABOUR.

MATERIALS

TO BE PURCHASED.

Forward

C.

C.

Casualties,...

MATERIALS

TO BE ISSUED FROM STORES.

PORTION

OF WORK TO BE PERFORMED

BY CONTRACT.

C.

$

C.

TOTAL.

C.

2501126

98874

TOTAL,..

$2600000

524

Surveyor General.