8962
the New Sea Wall this
increase
or
enience will much
It is proposed to carry in length from
Piles 100 feet
spar
on
out
a.
Breakwater
the Sea Wall, a Floating
the last side will assist
breaking the sea
and a small Harbor will thus be formed between the Jetty and the New Sea Wall ma
comparatively
naking
the Landing heavy weather.
by easy even during removed and
the
the
077
& Jetty.
Some
arrange-
out
The existing
Ost boats brought up
regard also become nece
cessary
ments with
to the alteration of the Dr
in
carrying
Drainage the proposed
works, at present a 3 foot drain empties itself close to the Harbor Master's Office,
West side
of
and a
the
6 foot drain the Pacific Mail Steam Ship
Mail Steam Ship Compry" pre-
mises. Both these drains it is proposed to divert to the extreme West of the proposed New Sea Wall, the water the Praya takes a head here
here is
deep and
as
itiona suitable place for the deposit of
The Total cost.
cost of
the
everage
the proposed works is estimated at $26.000.- $11800. of which has been voted by the Council for expenditure during.
dearing the
The current
6 year
1868 Supplementary
No. 38.)
REPORT AND ESTIMÅTE No. 2 3 OF 1868.
Wall Bonham DATED 10°
10th March 1868.
PARTICULARS.
LABOUR.
MATERIALS
TO BE PURCHASED.
Forward
C.
C.
Casualties,...
MATERIALS
TO BE ISSUED FROM STORES.
PORTION
OF WORK TO BE PERFORMED
BY CONTRACT.
C.
$
C.
TOTAL.
C.
2501126
98874
TOTAL,..
$2600000
524
Surveyor General.