less than 2 feet cube, the interstices to be filled in with spawls. The stone work above the Footings will be constructed of Ashlar Masonry every stone being hewn to the

required Quarry, formerly the stones were 4" back from the Face the

-

simply squared remainder being left in the rough. The proposed Bond is shewn the Section. No Live will be used in

Masonry

will be set in

tement and Puddle will

instead of concrete will

any hart Portland

of this work. the masongs be used for Backing West End, Joe Piles will be driven at the foot of concrete. For a length of 150 feet at the the Rubble Foundations on the sea side to prevent the stone from slipping, the

ground here being

sided on from

in will be

The earth required for filling taken from the Hill under Hospital Road.

connection with this work it will become,

to construct a Breakwater

Bo

cessary

end

Jetty

at the

a of Morrison Street for the convenience of the Harbor Masters Department. Even

able difficulty

now consider.

is experienced in landing during the N.Z. Monsoon by the breaking of the Sea

the Boat Slip

against

Fonward

523

25011 26

and on

The completion of

Forward

$2501126