8962 Supplementary
(Art. of Ins, No. 38.)
1868
桌
DATED 9
REPORT AND ESTIMATE No. 22 OF 1865.
4 March
1865.
OFFICE OF SURVEYOR GENERAL
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FORpletion of
alterations to Robinson: Road
PLAN OR DESCRIPTION.
MATERIALS
PARTICULARS.
LABOUR.
TO BE
PURCHASED.
$
C.
G.
may
be attribute
the
00 e
the alterations to Robinson Road are no cydo
Aubble Stone taining Mall apt. nearly completed and will be finished duni
100 ft. lin: boring for the current month, with the exception of the
Casting including cutting at the West end. The sum sanction owder & 187 under Report and Estimate 729 of 18608 $3, has been expended and it becomes recessu to apply for a small additional sum to complete the work. The cause of the origin Estimate being exceeded to two circumstances, firstly to fact that Old Retaining walls on being opened for
xamination, were found too insecur safely raised, they were accordingly pulled. down and re-built. Secon
a large block the hardest description of Granite has been met with in the cutting at the West end of
the Road, this rock which extends the whole width of the Road and is about 15 feet in length has to be removed by Blasting a depth of y feet. Provision for the furthe expenditure will be made in the suppleme
of
Estimates.
ase to be
Casualties,...
Approved,
(signed) AG MacDonnell.
Governor.
MATERIALS
TO BE ISSUED FROM STORES.
PORTION
OF WORK TO BE PERFORMED
BY CONTRACT.
C.
$
C.
TOTAL,...
:
TOTAL.
60000
36000
520
4000
100000l
Surveyor General,