OFFICE OF SURVEYOR GENERAL ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED F
in Public Gardens and Constructing Basin for:
same
PLAN OR DESCRIPTION.
as
to
shorn
0712
the
sum
The Fountain ordered last year from England is now being landed and it becomes necessary to make provisions for its erection in the Public Gardens. A sum was set apart for this purpose last year but orring
the mon
arrival of the Tocentiin. was not made use
of It is proposed that the Truntain shall stand in a Basin, bo fext in diambe accompanying "Flan, the sides will be constructed. of finely wrought granite and the floor will be laid with Marble Tiles, the depth of Hater will be 201⁄2 inches. In addition to the Iels from the Fountain there with be 20 large Iete and 350 small ones cesangs in the Basin itself. The head of Water with be obtained from the Military Nullah in which there is always a good supply even during the dry
Jeador.
The Siping and Jet's for this Basins will be ordered from Engin
: time the Basin will be constructed and arrangements
in the means,
made for their being fitted
ad dogrel no
they arrive.
The estimated Cost for the service is $ 3000 provisions for which will be made in the Supplimentary Estimates
300 Cube Yards of digging
of Concute
200
465
Fect _ of dressed. Stome in Walls 16 feet supl_b" landing under Fountain
4" d
under Basin Furs 2o Courses of Fed. Tiles
440
2025
2025
216
My
ajz...
به پایم گره تقویم
54
400
176 25
5070
108
205.
.
165
324
1 Counse of Marble Tiles
e 30*..
607 50
e $2.50.
540
200
* 35%
Co
run of him to Basins.
Labour in fixing Fountain
25. ft run of 25" Main
Reducing junction from 3 to 22.
1 - 24" -Jaon Stop Cock
95. 21⁄2" Iron King
J. T pires prdwing 22" to 2".
1 24 Wendi
4. 2" Bend's
ره کارت
ست
10
322
30 40
(@
1.25...
875
of @x2.
@ $ 250...
2150
8 16|80
37
8. 11⁄21⁄2 L pinces
48. Strun. 2" Supply
124
Sz do
Add Laber for fixing
359
@ 259
100
Approved,
(Signed) R. G. MacKannett
Governor.
Bonnell
Forward_# 2627|65
515