REPORT AND ESTIMATE
No. 2 of 1868,
P.
SURVEYOR GENERAL'S
out of Victoria
Repairs to Roads
ESTIMATE OF THE EXPENSE POR
$ 3.000.
Vitale,
December 18y.
021
OFFICE OF SURVEYOR GENERAL
P.
(Art. of Instructions, No. 38.)
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR Repairs to Streets
in Victoria.
PLAN OR DESCRIPTION.
REPORT AND ESTIMATE No. 3 OF 1868.
DATE/ December 1867.
MATERIALS
SIS ו
MATERIALS
PARTICULAU
LABOUR.
10 B PURCHASED.
IseDAD FROM STERER,
Pon pos
jor WORK TO PE
BY CONTRACT.
PERFORMED
TOTAL.
S
C. $
The Streets in Victoria still continue to be repair Hammers, Spades, Pictis te oud -ed by the Chain Gang. Queen's Road has been metalled from England in Misy last.
Repair of Tools in use big chame throughout; also Albert Road between Queen's
Gang. Road and Government House, these repairs will be supply of Bastlets sling. 8° for ditto
on laine and Bonharn Roads to continued throughi West Point Robinson Road has been metallid
between the Albany and lastle Road, on completion of the proposed alteration to the gradient the lower section of the Road will also be metalled.
Buring the
year
in addition to the laine and Bonham Roads it is proposed to Matal. Hollywood
Road throughout. All repairs are made by the Convicts but the removal of large stones or boulder's which frequently.
are found cropping upwire the middle of the road has to be effected by daily labor, provision Has is made in the present Estimate.
During the year
the
use of Basthets by the Chain Gang has been replaced by the use of theelbarrows which so far
have
sum voted for
for
the service by the lounail is
auswered well. The. $1500-
Coolies employed remorning
Boulders, Blasting ye
Casualties....
Approved,
(signed) R. G MacDonnell.
Governor.
A
325
250
250
500
Ja 1227/48
264
245
TOTAL............ 1500
K
Muling
Surreyes General.