HEPORT AND EXTIMATE
No. Trin♡)
SURVEYOR GENERALS
Vicoin, et December 188 %f.
Contingencies
Road and Street
ESTIMATE OF THE EXPENSE FOR
$2000
Pri
P.
P.
OF 1868.
203
Cart, of Instructions, No. 38.)
OFFICE OF SURVEYOR GENERAL
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR
out of Victoria.
Repairs to Roads
DATED/
REPORT AND ESTIMATE No. /2
December 1887.
PLAN OR DESCRIPTION.
MATERIALS
PARTICULARS,
LABOUR.
115 13
PURCHASED.
MATERIALS
36 10יני
ISSUED FROM STGRES
J'ORTION
or WORK TO B
PERVORMED
MY CONTRACT.
TOTAL.
Posipulum and
$
Aberdes Roads
During the year the various Roads have suffered. Repairs to Quarry Bay & Souflewan londo considerably from the effects of the Typhoons, all damage now been repaired, and ordinary
coured
Stanley Road.
Mong Nei Phong Valley Road.
Caroline Hill Arad.
فرا رسید
**
500
500
الله که مان
100
103
J
Little Hong Kong Road
200
Pathway to Victoria Peak
Bass to Pothguline
Quarry Bay Ro
Portfoli
200
100
~ 350 700-
360
571 You
350
240
thereby has however. refrains are as usual nearly suspended until the setting in of the next rains. The repairs to the Sea Wall on the Quarry Bay Road have been extensive and so far as carried out they are substantial.
Considerable repairs.
required between the 2m 10.000. @fr of Ballast on Barriage Zurn and Sowkewan, and also between
2 West Indian Overseers for 6 months of Aberdeen and Little Hong Kong.
the Quarry
hav.
aze
tvsh
the metal which has been placed on Bay and Pottfulum Roads during the year much improved them, it is proposed to prepare the
quantity again for during the rains, The Road to Stanley is in fair order anot unlezo the rains are unusually heavy will want but little doing to it. It is proposed again to employ Prest Indian Overseer during.
months of the year one the Potifulum and another on
the Quarry
12.4-20
*
10.000
户
to-
Bay
Road, without this supervision it is impos-
the -sible to get a fair amount of workout.
of Coolies employed-
vote for the service is the same as last year $3000 –
Casnoitice,...
Approved.
(signed) A. G. MacDonnell
Governor.
2.10
TOTAL......................$ 3,000
Surveyor General.