No.
Q
HSPORT AND ISTIMATE
-
d
SURVEYOR GENERAL'S
Victoris,December
Altering Levels and repairing Robinson Road.
ESTIMATE OF THE EXPENSE FOR
$3.000.
123
OFFICE OF SURVEYOR GENERAL
P.
(Art. of Instructions, No. 38.j
ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR. Road and Street
Contingencie
PLAN OR DESCRIPTION.
This Report and Textimate covers
the expence
of various services in connection with Roads and Streets which would not be strictly chargeable to
REPORT AND ESTIMATE No.. // OF 1869.
މ
DATED/ December 1887.
PARTICULARS.
LAWOUN
MATERIALS
TO BR PeachASED.
Repairing Sundry Boundary Retaining.
and Parispet Walls ditto. Steps in Taipings ham Chain Gang
the repair of the roadway . It includes the exection Supplying Tools for me of or repair of sundry retaining, boundary.
parapet walls
uced andi
Railings.
ditto of Mile stouts standary Hom the repair Banting Railings
of steps in places where the steepness of the Road makes their use me
The
Jools to reapply of
recessary.
the Chain Gang. The repair of segon boards, the
peupply of
required.
Repair of
and Fences
Ebreet sign Boards
Victorin and Villoges
$
MATERIALS
TO BE
Issury FROM
STORES.
PORTION
De Waux touri
PERFORMED
BY CONTRACT.
Jn 1227/45
262
TOTAL.
$
500
300
/00
100
100
100
250
tumbering.
Centre
Materials for Servsyning
Marking.
out Lot red i
100
repair of Blue washing and repairing
Dat 13
200
aterials
surveying. Poles to Also the creation on..
che
Ranging Mile Posts, during
OLA
without
ensuing year it is proposed: to fix Mile Ports on the Stantry Road. them it is amoeb difficult to direct the Road repairs
The
repair of also included under this head.
that
Bires is
are
constantly required.
Dust
Run'veta.d
by Council is the same as
last
Casualties,...
t'zar
$2,000.
250
Approved,
(Sigurd )2R. G Mac Donnell
Governor.
TOTAL...
2000
Mulin
Surveyor General,