P.

(Art. of Instructions, No. 38.)

OFFICE OF SURVEYOR GENERAL ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR

Centrifugal Pump, Nortar. Will and

""""

PLAN OR DESCRIPTION.

Jug - Mill..

It was decided in June last to order from England,

an IF

DATED/ et December 1867.

OF 186 P.

REPORT AND ESTIMATE No. 4

One #

Engine,

MATERIALS

PARTICULARS.

LABOTK.

TO BE PURCHASED.

Common Fire Box Duplicate. -

Brasses & F

c.

C.

a Centrifugal Pump. Mortar Hill and Jug Mill with cost of 88 Portable Engine fitted with

Portable Engine.

to work them. The Pump will in the first instance be Works where considerable de

"Freight included the Potifulum Reservoir Cost of Centrifugal Pumps to be

experienced last work by Engine Freight inclrusted

made use

of difficulty

at

wao

year in keeping down the water in the Juddle Trench with Cost of Travelling steam Grand fitted Hand Labor. The

Kortar Hill will be used wherever the massive building work is going

on, it is anticipated that by getting the Lime down &

In the shall from Canton

4 purer

it

Ox<

and

and grinding btained, while the advantage of ones

I will be obtained, much fresher a

Linke

the

-mortar by Steam power instead of by hand is undeniable. The Jug - Will will probably,

in the first used in the construction

the of to make use of Puddle for

Linstance

be

Hall, the intention being

new Sea

Backing in preference to concrete, it will also when

the

Piddle French is ready

at the Reservoir Works

be used for making Puddle there.

The Travelling intended to work

Heam Crane which is also ordered is

the Tramway

at the Pokfulum Reservoir, it will be most useful in lifting

into

the

Wagons large Boulders which now have to be split: before they can be raised by the Tackle at present in uve

For all probability the cost of the proposed Machinery will be saved long before the completion of the works on which they are proposed to be used.

The sum voted is $ 6.000.

Approved,

(Signed) Richard Graves Mac Donnell.

Governor.

on Railway Wheels 4:07 Sunny. To lift 30 cut. #2 Iron skips fitted with

Filee bottoms 6 chain clings ve One Mortar & Will y feet Diame fitted complete.

One Juge Hill with Vertical shaft of extra strength, fitted with 2

5 of Knives.

sets

Casualties,...

MATERIALS

TO BE

ISSUED FROM STORES.

PORTION

OF WORK TO DE

PERFORMED |

BY CONTRACT. I

TOTAL.

G.

0.

e.

1800 --

1600

1000

200

200

TOTAL.

6000

Mution

Surveyor General.

Ju1227

252