Proceeding with the filling
is completed to Low water
Mark, the wall would
then be backed up. Course
b
Coc no e
03
finished
Buildings, Trees & A great number of trees
have been blown down
and injured. The repairs
to Roads
are
being executed
by the Chain
Gang.
With regard to Buildings
considerable repairs to Roofs, Doors, Windows &c
are required. I should
roughly estimate the Cost
at £2000 and as
these repairs cannot be delayed
345
I beg to be authorized to incur the necessary expenses.
I have the honor to be
Sir,
Your most obedient servant.
Muirson, Surveyor General.