Guttered
It must be long
263.4878
version of theDonnell
No 63
JUTE
145%
6th June 1867
With reference to the correspondence which has passed between this department on the subject of a Reservoir at Pokefulum, the construction of which was explained in my despatch of the 1st, it must necessarily be postponed, I have & request you to call upon the Surveyor General to send home properly prepared detailed drawings & particulars of all
Page 150
Page 151
However, to follow the exact output format as requested and to apply the rules for OCR proofreading:Guttered
bcur
It must be long
263.4878
version of the Donnell
No 63
JUTE
145%
6th June 1867
With reference to the correspondence which has passed between this department on the subject of a Reservoir at Pokefulum, the construction of which was explained in my despatch of the 1st, it must necessarily be postponed, I have & request you to call upon the Surveyor General to send home properly prepared detailed drawings & particulars of all
Page 150
Page 151