to

with Brickwork backed

the Rock with concrete.

The vertical valve, well

+

to the centre. Live

of

Aud

way

flush

be near

may the Bank

be divided vertical

sketched - The valves being placed

in the dive

dividing partition

-

Bank

water level

inner Culvert and rise in the

the uver

half of the valve well the outer half and culvert will be dry when the valves are not open -

176

The proposed dimensions of the Bye Wash are ample - Concrete

should be used in the construction

of this work in place of puddle

vertical steps not

greater than

three feet should be formed

Outer Culvert.

Inner Culvert

with an inward slope

ao

Cross Section of Bank along of outlet Culvert and Valve

line of outer

well

The Midfeather in the valve

well should be

of cast iron.

The Valves to be fixed in

as indicated

it

The water will fill the

...

Longitudinal Section

of proposed Bye Wash.

All through the work Concrete should be used rather than

puddle, where there is

liability

of any wash, creek & water

Share This Page