The angle of the hills rising on all sides from the natural side is steep, being in some places 50° and at others nearly perpendicular.
It will be seen that the height of the Bank has been fixed at 50 feet in consequence of the nature of the ground where it is proposed to construct the Bye Wash. A Bye Wash could not have been formed at a greater height without cutting into the side of the hill.
Edations to Valor Mill so Cubie ft. - 20° very heavy labre Pell 5'2 5'. 20 ft.
**
178
72b41 80
6.000
640
pc $15.
300
ponry in Malls of Bye
2400
The proposed Embankment will be laid on a Bed of Concrete and will be formed of Material excavated from the inside of the Reservoir, carried by Coolies in Baskets and rammed in 12 in: pouts Paving to bed Layers. The puddle Wall will be formed of Canton River Muds, an excellent Material for the purpose, it will be protected by 2000 Cubic ft. of decomposed Granite and stone also rammed in Layers. The seaside slope, Syphon, and top of the Embankment will be faced with Granite in 12" courses laid in Cement and pointed with salt.
Sestra Delivery Stand's
Quy
A Valve Well will be constructed on solid Ground on the South East side of the Embankment and 25 feet above the Beds of Sumping, leading off the Reservoir, within this Well Sluice Valves will be placed to draw off the Water at different Levels, a Culvert 5 × 3 will communicate between the Valve Well and the Gauge Basin and in this Culvert 10 Pipes will be laid to draw off by a Syphon arrangement.
1000
1000
9.800
4000
Conveyor Gen! & Ass Surveyor
ent the lower 25 feet of Water from the Reservoir
I believe between Next 4 Pottefulum -
500
2000
#96.281|80