the
Oru
Forrard
is brought forward. A flight of stips is proposed. North side of Government House 15 ft wide between the "ential Hall, 1. to light Parapets this will give communication between the upper Guian Lamp to adapt level and the path lately formed. A short flight of steps and fit for Gar is required, East of the Guard House to give
commented. Passege 2.2 Lt Boat lights betireen the - upper level and the stable Gard, and another short flight at the North East Entrance to the grounds. A considerable amount of drainage will be required both in the upper and tower Grounds the particulars of which
are
to adapt & fit for Gas af 25 ea. Coming bleern. 2. 4 light
to adapt for Gas of 25 car.
state loom 1.3 rights d
given in detail. It will be necessary to execute this swing Room 1. Wight d service by measured worth.
ما
150 2.3 Sight
braces to Gas Beachtuts of 18ca.
Testlers Room I double st
Pendant with temps fittings #fabes
miry / cingle. Itt Brachiud
Bucase. / Wall Lantun
adapt & fit for Gas.
her Floor Galleries overs Consider
Lobby Fights cf 25 cm.
Bed Room 10 doceble Lies.
un Buanes for Conhal Hall
ng Room 2 Scroll Brackite $30
6
855136
30
50
50
25
23°
50
60
9
3
100
sol.
200
601
Formand 1582|36