March 13 1865
THE MASTER OF THE MINT OF HONG KONG.
For Chas. Tookey.
Inspections of material and apparatus at various dates, connected with the assay and chemical departments. 1864
| Date | Apparatus and Material | £ | s | d |
|---|---|---|---|---|
| Dec. 3 | for Laboratory in Mapa "Griffin contract | |||
| One inspection | 10 | 0 | 0 | |
| Apparatus and material for the Assay room. | 20 | 0 | 0 | |
| and Melting requisites in Meps Johnson & Matthey's contract. | 24 | 0 | 0 | |
| 220 | 0 | 0 | ||
| 2 | 0 | 0 | ||
| 20 | 0 | 0 | ||
| 2 | 0 | 0 | ||
| 20 | 0 | 0 | ||
| 220 | 0 | 0 | ||
| 880 | 0 | 0 | ||
| Dec. 26 | One inspection | |||
| Balances for Assay room & Laboratory. Meps Ladd's Contract! | 26 | 0 | 0 | |
| 220 | 0 | 0 | ||
| 440 | 0 | 0 | ||
| Dec. 29 | One inspection Assay room muffle furnaces 1865 in Ms Rolling contract. | |||
| 24 | 14 | 0 | ||
| One inspection | ||||
| Examined and Approved the line item | 220 | 0 | 0 | |
| 16 | 16 | 0 |
Page 180
Page 181
ON THE
176
SERVICE OF THE MINT OF HONG KONG.
March 13
THE MASTER OF THE MINT OF HONG KONG.
For
Το
Chas. Tookey.
1865
Inspections of material and apparates at varion, date, Comected with the anay and chemical departements. 1864 Apparaten and chemiest
Def. 3
10
20
24
for Laboratory in Mapa "Griffin contract
One inspection
صور
Apparatus and material for the Assay room.
and
Melting requisites
in
Meps Ichuson I Matthey's
contract.
£
& T
#
£
8. 么
220
2
20
2
20
220
880
وله نام دام قلم
26
26
One inspection
Do
29. Balances for Assay room &
Do
22.0
220
440
0010
Laboratory. Meps Ladd slitting
Contract!
One inspection Anay room muffle furnaces 1865 in Ms Rolling contract.
24 14..
One inspection
in the rider of fl
Mr
Examined
Approved the line ham
J N v u
220
220
16 16 0:
Page 180Page 181
No comments yet.
Private notes are available after approval.