Recommend, under the Cercumstances

Sie F Rogen 2244065

mentioned

Sanction

histhi Meren, for Sunsung

M. R

Mr. Mercer

to

The Rt. Struble R. Cardwell

No 183.1 Inclosure

Puceived

Marine Lots 1 and 2 al- Sea Wall and reclaiming

Nr. 2771865. In building

Report and Estimate

Submitting Supplementary

Kowloon.

P.

(Art. of Instructions, No. 38.)

Building

OFFICE OF SURVEYOR GENERAL

ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR

Seas Wall and reclaiming Murine Lets 142 Kowloon.

PLAN OR DESCRIPTION.

Securtiruntary

REPORT AND ESTIMATE No. 27 OF 1865.

DATED

20th July

18647

520

MATERIALS

PARTICULARS,

LABOUR.

TO BE

$

2.

PURCHASED).

Ca

MATERIALS

TO BU

ISSU FROM STORES.

PORTION

OF WORK TO BE PERFORMED

BY CONTRACT.

C.

TOTAL.

C.

C.

rate @ $14

2800

20,000 Caber Youds of felling a 10

2000

Hew Mojesiy's Commment: boving prauamdi Arina 2008 ft limate of Lots 1 & 2 Kerloon' it becomes necessary that the Conditions Feastiall at Contract

of state which should have been carried out by the Original Purchaser be now completed. The Conditions required that the land should be reclaimed and the Sea Wall finished within' Six Months of the date of Contry. It is the more necessary that these Lots should at once be fitted in because the Tenants of the adjoining Labs No 24 & 25 have commenced work some Months back but have been obliged to stap by the Purchaser of Lots 152 neglecting to fill in at the same time. The Seas Wall in front of all the Marine Lots is being built by

la morr

one Contractor and

completed up to £. W. Mark. Both the reclaiming

and erection of Sea Wall will be executed by Contract.

4800

4000

Approved,

(Signed) WI.. Mercer.

Acting

Governor.

Casualties,...

TOTAL

4800

Wurlion

• Acting

Surveyor General.

Share This Page