(Art. of Instis, No. 38.)
erface Drains
DATED 2
REPORT AND ESTIMATE No. 5 OF 1865.
2nd January
180 .
OFFICE OF SURVEYOR GENERAL ESTIMATE OF THE EXPENSE NECESSARY TO BE INCURRED FOR
PLAN OR DESCRIPTION.
MATERIALS
PARTICULARS,
LABOUR,
TO BE
PURCHASED.
$
C.
MATERIALS
TO BE
ISSUED FROM STORES.
PORTION
OF WORK TO BE PERFORMED
BY CONTRACT.
C.
$
C.
TOTAL.
any
This Service is one
which will be annually required till the Roads and Sheets in Victoria are completed . It is usuals to lov the side channels about 12 Months after Road is finished and till this is done the surface is sure to be torn up during any particularly if the gradient be at all very heavy fall of rain, more, steep. It is not on the other hand practicable to lay the side channel before the road surface has had time to cerwolidate or lill the drains
are
the
completed. I propose
new
کتنی
this
1100, Fin of surface
ain curd stone, chamfund
bud
laid complete in
That @ 50.
boo Br Battery Road @ 50
206 to Albut it: @ 50 2000 Sundry Sherface drains
550
300
400
34
1000
year laying side Channels in connection with drain in Third Sheet at the Western end, and on
the Flood the picer of Road-
Juniry Catchmater drains
astroint 300, it link @$2.
Shaved work to Catch.
aki drains at Cost and
est Points 1000 ft Sundry Catchwater drains verray Bay booth op 2
600.
400
1200
running thence to the Syingpoon Nullah. Also on betireen Albert und Garden Roads, from this not being before done the lead has been a continued source of expense during the ruins. generally 1.6" wide with Curt Stines to high. Gully -holes are formed for discharge of surface water ut intervals of 50 st
condugrund
rund drains.
The drains ure
into the
"Cutch water drains have occasionally to be made under this unechōrity,
In extension will be required both East and West on duning up of Causeway Bay and on the commencement of buildin latily sold at the junction of Potefulum and Bonham Hove The Amount voted by Council for this Service is $ 5000.
the
Cre
Approved,
[signed] Hercules del Robinson
'Governor.
@ 400
Casualties,...
44450
4450
550
TOTAL,..
Mortion
$5000
Acting Surveyor General.
ارد پادشا مروا مرسن معلمی اور ادا
C.
51