OR hopo : - / opposite the Entrance to the Workshops :- The stabling works, arranged Forward the elevation corresponding with the Foreman's house windows with te red on the East side of the ashench basements arranged for book houses. Five cant offices tovo are on either side of the Inner Gard. - are all enclosed within a 13 Clining "fored completed" headed-do- Legeare 41.30 Boundary - - with gates are of thou doveday pointed – de The Builder gale wall 32 ft in height. the Entrancez feet of Iron railing of this Bricking wither side of them, woodwork in the 17 six oquare clinings transoms @ 836 38742/86 65 1877 4350 55 Fr- 612 132. 72. 12 481.

Five contracts will be entered into for the erection 4 de no transmes @ 53 ho 1 and 2 workshops, H. 3 In all dons and windows both in shops offices sequers with sion baro te roof of Camell pomited fo a Dwelling House, these Contracts have been already 38 doon spanel both amount to M. Ladd will prepare the wh. I 72 4.30 cts, the contractor sides moulded @30,50 and anticipated in a for the erection [doors fetting com manneh. machinery Contract N. 4 will a experion of the offices and de of 1159 and it is be 3 d. beak flush is 1 pointed glazed panels 544 32 30 40 dwelling house complety shean a fleach folding Z 哗 and windows excepted and all fromwork and other from England) the workshops with the 3 all internal fittings, partition 8 - do Building he Foremans having been abraty recepiting of the wo for the Building the forbidation prepaded. This Contract includes house 25 25 تھے کمر Forward کی تر 200 $ 42892 36

Share This Page