Forward connection with present supply 50 feet run of 1½ inch pipe from proper We Fetting to Privy staircase pan 3.68
To Water closet for Clerks complete
To construction of flight of stone steps fixed complete 40 cubic feet
To cendry @ 50 p
Works in lengthening to culvert for Kitchen and drains 683
Gratine loop holes in wall for cell ventilation
Forward 2000
30 50 20 10 $2140 140 AY