REPORT AND ESTIMATE No. 8.

January 1864.

OF 1864.

166

No. 38.)

in Victoria my xc)

DATED

PARTICULARS.

LABOUR.

MATERIALS TO BE PURCHASED.

MATERIALS TO BE ISSUED FROM STORES.

PORTION OF WORK TO BE PERFORMED BY CONTRACT.

C. G. $ C.

carries forward

through the wall where it is July no drains exist in one district where the swell set in his from Seer House Street to Lower Bazaar, that I propose making this change; it will connect in the home the lower stones of the parapet and under course stone 12 inches thick with chamfered price and other stone which is 2ft by 7.8 as

This work in the stone now on, a4 a flight th by 27. th construction se brought forward parapet will be used a for paving.

by measurement soon the coping stone or services will be executed by contract.

The above of the lost itton on the case of t

For lineal ...

Casualties,...

TOTAL.

C. 7416

c. TOTAL...... 584

$8000

firestone Arm

Surveyor General.