12x8 so as the support flag stones of possible water way. Information of an arch.

Item 2. Forward rubble drains to the Road. The double drains or Parapets are formed excavation, rough split ashlar, with invert of the vaults 400 @ 10 such toncrete in same adopted in general by me in each position!! elaborate causing of the drains being protected deep 1600 @ 3 foot of filling to prevent the jar of carriages passing abutments in sequence.

Reval preventing larger Bridges; f wheels. In this Estimate in consequence of proximity to the Quarries, contractors may be enabled to reduce the items referred to in a certain exercise and Sum of expend, the hullah estimates need not be molt.

alls may in this work for the abutments. But the first ition of this work will be arranged by Contract and executed so as Lone Cont with the Nullah work to which have refer Howard counter forts being added to the Nulla and Jone.

40 48 1 663 42 154 1215 20 130 321 1433 52 $2096 94

The text "کہیے" appears to be out of context and is not related to the rest of the content, it is likely a remnant of a different document or a misrecognition by the OCR engine.

was removed as per rule 12 and 16. The original text "aterway. lefonnation" was corrected to "water way. Information". Other minor corrections were made to improve readability. The numbers at the end were formatted into a table as they appeared to represent a list of numerical values. The text was formatted into paragraphs and a table using HTML as per the instructions.
Share This Page