manner.

Forward

level line: To 122 cydr. filling

a l

I have been obliged to design it in the shown for the purpose of obtaining of road, which any series of arches would not admit of and at the same time give ample water way in floods. There are to be eight Bay's and seven piers forming a total length of 100 feet the actual waterway forming a clear length of 62 feet that of the Bridge above being 50, there will be then little but to prevent this comparative secure floods, but to the Bays will be paved throughout and for a length of 16 feet below bridge also the outer line of pavement being formed with headers 3 deep feet.

The prices will be of dressed ashlar with thorough headers in each course the alternate courses of the starlings being in single stones, the other course camped together, stone Bressumer 12×8, 4 feet apart will take the principal weight, these will be crossed by closed jointed stone joists.

Conce string above this a plinth 12 inches high chamfered will show in each Earl dressed as a the outside this will retain show on the outside this will retain filling.

3 for Road @/20

4271

121

2440

and

#429600

Share This Page