95
wood, bow and side ports fitted for closing with Screws
The Midships of the deck to be open and secured with iron bars the whole length of the deck 6 amidships tapering to 3 at bow and stern.
deck Ten hammock hooks to each cell, strong ladders fitted to upper deck on both decks.
2nd Deck. laid 7 feet below PL deck, beams of Manila hardwood & fret, deck 3 prime, stringer 8x4. as lower deck beams prime.
Eight cells fitted on each side, those of 12' & cuttles 18 x 18' ent in each cell under the stringer and secured as those of PL deck.
Two bowports and two stern ports 3×3 and filled with closing cut, iron gratinged ports as above, Two strong ladders to middle deck.
The ballast shifted and the ship thoroughly cleansed from the cleat to the Keelson, limbers cleared and three Coats of white wash on hold, first and second decks, the vessel Caulked from Copper to Copper decks inclusive.
Outside, upper deck and roof painted with two coats of dockyard yellow paint...
Fifty tons of clean Stone ballast put into the ship.
An imm rail fitted round Main...