dotivatio for nest

to the P

service consists

spear.

ww

the

formation of two walls einitors Prayar exclusive of the semi-circular projecting coping each 3.90 fat in length, connected with the Battery Road Bridge reterining wall

on the forth and the Private work. Prayas, walle

for the North. The bed of the Bullah will be paved with 12

on a bed

Linch achter depth of

over

the whole

Masonry

foot upon a rough

area and base

rafe

of

concrete of

an average

tome base of 2 feet extendi of retaining walls to the Ponye

at the termination the invert will be formed of headers? deep with a line of Molave sheet piling 10 feet doop and : inches drick extending in the

manner chewn

sand in

by rough

action of

and

i

plan, the dredged away and replande in depth to comnteract the

scouring

front being escavated as

stones to feet

5

the water..

The Bridge in connexion with this work is provides for under Report and estimate ne 3 of 1863, and whing it will be placed the abutments will be assisted

-forts as shown: the whole face of the work

[counter

Forward

9,532.50

will

Forward

9.532.50

206