dotivatio for nest
to the P
service consists
spear.
ww
the
formation of two walls einitors Prayar exclusive of the semi-circular projecting coping each 3.90 fat in length, connected with the Battery Road Bridge reterining wall
on the forth and the Private work. Prayas, walle
for the North. The bed of the Bullah will be paved with 12
on a bed
Linch achter depth of
over
the whole
Masonry
foot upon a rough
area and base
rafe
of
concrete of
an average
tome base of 2 feet extendi of retaining walls to the Ponye
at the termination the invert will be formed of headers? deep with a line of Molave sheet piling 10 feet doop and : inches drick extending in the
manner chewn
sand in
by rough
action of
and
i
plan, the dredged away and replande in depth to comnteract the
scouring
front being escavated as
stones to feet
5
the water..
The Bridge in connexion with this work is provides for under Report and estimate ne 3 of 1863, and whing it will be placed the abutments will be assisted
-forts as shown: the whole face of the work
[counter
Forward
9,532.50
will
Forward
9.532.50
206