the

WAMW/VWen

[lo virginally constructed, it was found to be insufficient.

waters over yoy Superficial foot gravel deps woodp to carry off and withstands the heavy rush, of

during

floods and it was therefore deemed absolutely necessary to lay the whole surface of the top.

Forwards

$3907.13

$3850

30

-

3

30

therear

the Fram with granite, and to build high, skirting wall: Alterations to sluice valve, frame thou

to allow the over

flow to pass off freely alteration and additions the possibility of damage in future.

-

QA

P.A

es provende

lo

The alterations and additions to the Service Reservoirs Elevated Service Reservoirs 803 1992

Aneh 0.

also found to be absolutely necessary and unavoidable The site of Reservoir Ive not being the same as originally

proposed, it was

found necessary

to build a considerable quantity of cobras relaining and other walls, it was found to afer to support.

611% Cubes yards excavation @16 cents.

11,542. Cube feet rough, Stones masonry in foundations $18 cento.

The covering arches are support. 24,760 Cube feet conroed granite, masonry

ahe

W

is

in moitine

28 cents.

@38 cente

granite division walls instead of brick piers as original

obliged to be built 1/2 Cube foot granite coping designed, and, the unter walls were higher than first contemplated in order to obtain great

19,311 Cube feet brickwork in mortar springing for the covering arches. The additional wo

lo Reserves no 2 consists in the ovnstruction

of

considerable quantity of untoide drainage together with a flarge quantity of drainage works underneath the both

@ 20 cents.

1086 Crude foot brickwork in arches

including centres 28 cents.

401 9780 2.07/7-56 6932 00 9976 3,462 20 30408 Forward, $11974 20 4796-63 $1177420 4,125 63

Forward, $11974 20

4796-63

$1177420

4,125 63

152