Forward
29.6.8
790 139
354
To repairs to 25 gullets and enlarging mater rays cost 6.5._
To repairs of Catchwater drains, 1760 yards @?__
Contingencies 10%. Item 7.
-
7.6.8
42.18.4
4.5.10
£47.4.2
To general surface repairs, 1960 Yards @ 24.10.
Contingencies 10%
Item 8
-
2. 9.
£26.19.
To general surface repairs 2880 yards @ 3---
To Construction of 4 new ways paved Channels £10 40._.
To construction of 1000 yards Catchwater drains @ 3 – 25. –.
101.
Contingencies 10% 10. 2.
Forward
111. 2.
47 4
26 19
/// 2
975 18 11
2.