Forward

29.6.8

790 139

354

To repairs to 25 gullets and enlarging mater rays cost 6.5._

To repairs of Catchwater drains, 1760 yards @?__

Contingencies 10%. Item 7.

-

7.6.8

42.18.4

4.5.10

£47.4.2

To general surface repairs, 1960 Yards @ 24.10.

Contingencies 10%

Item 8

-

2. 9.

£26.19.

To general surface repairs 2880 yards @ 3---

To Construction of 4 new ways paved Channels £10 40._.

To construction of 1000 yards Catchwater drains @ 3 – 25. –.

101.

Contingencies 10% 10. 2.

Forward

111. 2.

47 4

26 19

/// 2

975 18 11

2.

Share This Page