not recceding a length of 250 feet or up to the prment line of a catch water drain As now existing,

Murney Battery. Here the originst difficulty to presents itself as reported =

in my letter referred to. - I um of Opinion that

any

additional works

which will lend in the remetest degree to imprede the circulation of air to the Government offices, (which is already- placed at lor low a level with respect to the Battery) must be excessively- injurious, and unless the necessity_ fran.

an extension of the work is of

paramount importance,

and Can in

no way be dispensed with, the

propona

service shorts be executea in

a manner to do as little damage

476

-possible to the Building and grows

with this wee

there fon

Adjoining: the Commandings Royal Engine

Agreas

--

with me that, the least objectionable

mode of effecting the objich is to comfy

the ground running parabial with the path from the Battery to the Cutivanol, - of no greater depth time 5t furt

to the pathway going

width and a

ex fir

North from the Government offia,

joining the first

in

und

named path. That

the additional work shall not be enviena

in the rear and the Plot

at form pious

at the lowest practicabli love 2.

Share This Page