El

Fi

سمجھ

prepared before it can be built in; in addition to this the

arching of the whole of the

of

basement occupied a considerable period and required great care

and attention..

my

Report upon tablic

Works I have detailed the

the

plans I have adopted for preservation of the Timber and the due ventilation of the building. it : therefore. unceessary for

ane

t to

to recapitulate it ; suffice

say

that.

my best energies shall be exerted to render

the whole building as perfect specimen of work as the

mean

at my disposal will

mable me to effect, and trust

that in ten

on

ths from

the

רן

$25

present date the building offices connecteit with it will be finished and so that it may be fit for occupation

beginning of April, 18511. Gaol Buildings

the

At the

in.

I have been unable to obtain

the assistance of any Sappers, which is to be regretted as somes portions of the work require

constant attention which I

arri

able to give

naturally unable to

with the other services demanding

my

attention.. I however

manage

to visit the buildings regularly,

and if possible twice and have much

ex

day

che pleasure

stating the work is

in

is progressing

properly and the Contructors

giving satisfaction..

Share This Page