bevetting the area adjoining the and the Murray abere Building, Battery, to prepare the e for grassing, planting, etc., and an comprises all that all that work not estimated or contracted contracted for inder Rop : rest. No 5 of 1846 : portions of 1 ground Weis rvere exceedingly rough and full of heavy stents, and in conseque ll the work could not be measured, portions of it havever the avere, 2 ore o of which cost 1° 12. per yard, but generality of it has been done yd : the total uncount, under labour expended thereen " of to 317 December, is equal to Lysthm A considerable quantity of quantity of work. is still required in this locality, the heaviest of which consists in sloping the ground to the rear of 509 13 Goverment offices and Churals to the Road instead of leaving it work will be as at present horizontal, this _ a great improve. ment to both buildings, it is execedingly rocky in 20171L, e parts but soft in others; in all... probability swill cost 6 per gard throughout, there is 23.959 cubic yards carried ards in that average area, to be e distance of 400 feet; so that I expect the work of the 6o. for- will occupy the labour whole going of 12 months at least, assisted, by It may slove-cutters besides. therefore be estimated that the above work and the contemplated. Road to Goverment House will occupy their time for live your

4th Miscellaneo's work is L equivalent

Share This Page