Towers, for the whole of which materials no

made

charge

will be

Quantity

Cube: yards

cube feet

Timber will also be provided if required the Contractor paying for the same at cost price.

609 Excavation for foundations

12333 Rough granite in

661 15 Brickwork laid in mortar including price

of Scaffolding -

Estimati

Rate merent

d.

6

15

4

سوگو

308

6

719207

16

123 10

course 1. & high_

a

4410

steps to entrance.__

اخر

26

7

48

9

27

forring

2 50

68

**

0 200

2964 Brickwork laid in Cement in pillars

lin: It

712 Pressed granite Plinthi

sup feet

904

80 Carved stone corbels,

sups: feet

100 Dressed

Dressed granite steps in circular stairs

& granite steps

squares

27 28

54.25 Marble flooring

251.8 Plastering interior including all mouldings

223

110.

cube feet

237.

exterior in Roman Cement Z

"Manila hardwood wrought and fixed

283.84

239.25

ل جوان

4

442 10

44

223 30 1657

8 9

00 20

روح کرد

سرم

Double tiling laid in mortar

04.

trot beaded framed & fixed_ __Circular, moulded, fod & fixed

@16.

s. d

4.6

77 15 167184

75 403

746. 3 American pitch pine wrot, beaded & fixed

• __ the planking, worst, tongued, and grooved, beaded and fixed:

squa124-

107.5

30. 26

grooved and fixed.

suhe fest 206 lin St.

112

China fir is planking wrote, longued,

Thina for joisting, wrought & fixed

Manila hardebood step ladder

14 3 Manila hardwood doors framed, moulded,

Gothic arched and hung complete, frames

included

hung

Carried forward

20

"

57.666 2

20 12

11 4

6

260 52

"

$4465 10 14

Share This Page