Brought forward £ 1,455 3 4
-@L5
Flat Roofing, & Squares- Foundation in rough stoe. 2,000 cwrfect. (@b
Home
Contingencies 10pt Cent.
Total Cost of the Tower
Brick, wok in Main Building 16000 cu. feet @
Pillars 3,000 Cu-fect
8
30
50
&
1,533 34
15364
168 69 8
1,341 13 11
10
@8 100
2/6 13 11
w44
Arches and spandrils 5,200 eur feet. @ 10
Doors and Windows cut. Stone. 7,000 curfect (@h) 14.00
Caps to Buttresses
Plinth - Course - 700 cu.fect.
Parapet. 1360 Cu.feet..
Pinnacle and crosses
Roof 160 squares
1.900f-160
Ceiling 160 squares.
60
"
@3/ 105
*
@lip 272
100
@ £5 800
@ Z 2
320
250
#
"
420
"
133.
A
A
Ornamental Plaster
Marble Flooring 70squares __ @ I b
Raised flom for sittings 90–1071.10
Concrete in foundation. I
in foundation 2000 in. fut 23 | 37 10.
Carried forward £ 5.557.16.8
1
$60
Brought forward. £ 5,557|16|8
@
1500 cube feet: rough store in foundation & ? Hardwood Seats with arms say 380 @ 12/6 each
Forms plain free seats 500.
windows 1000 su: feet
blazing
@5%..
4. feet. __ @ 1/_
Pulpit. reading desk and fort
3710 187 10
125
50
60
"
6,017 16 8
Contingencies 18ft Cent. ___ 601 158 Total Cost of Main Building £6,619 12 41
retimate for
Tower
£ 1.686x9.8
#
Main Building
6619.12.14
Total Amount £8,306,20
(Signed)
(True Lopy)
I have te.
Chas: Ges: (leverly-
Acting Surveyor General.
Prederick "MA. Bruce