Brought forward £ 1,455 3 4

-@L5

Flat Roofing, & Squares- Foundation in rough stoe. 2,000 cwrfect. (@b

Home

Contingencies 10pt Cent.

Total Cost of the Tower

Brick, wok in Main Building 16000 cu. feet @

Pillars 3,000 Cu-fect

8

30

50

&

1,533 34

15364

168 69 8

1,341 13 11

10

@8 100

2/6 13 11

w44

Arches and spandrils 5,200 eur feet. @ 10

Doors and Windows cut. Stone. 7,000 curfect (@h) 14.00

Caps to Buttresses

Plinth - Course - 700 cu.fect.

Parapet. 1360 Cu.feet..

Pinnacle and crosses

Roof 160 squares

1.900f-160

Ceiling 160 squares.

60

"

@3/ 105

*

@lip 272

100

@ £5 800

@ Z 2

320

250

#

"

420

"

133.

A

A

Ornamental Plaster

Marble Flooring 70squares __ @ I b

Raised flom for sittings 90–1071.10

Concrete in foundation. I

in foundation 2000 in. fut 23 | 37 10.

Carried forward £ 5.557.16.8

1

$60

Brought forward. £ 5,557|16|8

@

1500 cube feet: rough store in foundation & ? Hardwood Seats with arms say 380 @ 12/6 each

Forms plain free seats 500.

windows 1000 su: feet

blazing

@5%..

4. feet. __ @ 1/_

Pulpit. reading desk and fort

3710 187 10

125

50

60

"

6,017 16 8

Contingencies 18ft Cent. ___ 601 158 Total Cost of Main Building £6,619 12 41

retimate for

Tower

£ 1.686x9.8

#

Main Building

6619.12.14

Total Amount £8,306,20

(Signed)

(True Lopy)

I have te.

Chas: Ges: (leverly-

Acting Surveyor General.

Prederick "MA. Bruce

Share This Page