advantageous le avoid expending any
the repair of the old line, - money immediately to adopt the new line, and
to leave the old Road on the higher
level from
B le C
batchwater
ad o
be authorized.
231
I return the Report and
flan, sections 1913. Côtimate Flan and 2 Sections.
I have, Je
(Signed] Edward Aldrich, Maier.
Comy. Dr. Wufz. Eng:
Channel for the lower line.
The Acting Surveyer General
in hie Beport upon this service, has Nr. 15.
stated that the Sum Required for s Bridge Nr.1. was estimated for in $215
1 1844, but deferred from insufficiency of funds. The
amount now.
now Required
for this Bridge is therefore an excess
upon
that Service which I understand Nr. 15/44.
has already been directed to be...
executed.
It will therefore be more ....
Regular to
lar to provide for such excess __
separately, than
new to introduce
it into a service which has to
be
Frederick W. A. Bruce